Environment & Power Technology replaces Salford's Allerton Building AHU
- University of Salford
- North West
- Call-off
- 3 September 2026 to 9 October 2026
The University of Salford hired Environment & Power Technology Limited to replace the Allerton Building's air handling unit, on its Frederick Road Campus.
The unit, on the second-floor roof above the ALS202 study space, had reached the end of its life. A steel platform was to replace its damaged timber plinth, with the roof covering reinstated.
The university ordered the work through lot 3 of Regenda Limited's Construction Works and Services Framework. The £216,793 contract ran from September 2026 and was due to end in October 2026.
- What
- Ventilation and air handling systems
- Value
- £216,793
- How it was bought
- Call-off, Regenda Limited
- Dates and next
- Sep 2026 to Oct 2026