Stanhope Road retaining wall works in Smethwick go to HFN Landscapes
- Sandwell Metropolitan Borough Council
- West Midlands
- Open procedure
- 31 August 2026 to 25 September 2026
Sandwell Metropolitan Borough Council hired HFN Landscapes to stabilise a retaining wall at Stanhope Road in Smethwick.
The new slope was to be built up with inert 6F2 stone to the tender drawings and held at its foot by concrete Lego blocks. Before that, the site was to be cleared of rubbish and overgrowth and treated with systemic weed killer.
The council chose the firm after an open tender. The £66,688 job was due to run from August to September 2026.
- What
- Retaining walls, slope stabilisation and land hazard works
- Supplier
- HFN Landscapes
- Value
- £66,688
- How it was bought
- Open procedure
- Dates and next
- Aug 2026 to Sep 2026