Baker Hicks manages BIM for the Bassetlaw Contact Centre project
- SCAPE
- East Midlands
- 1 April 2025 to 31 March 2026
SCAPE hired Baker Hicks as BIM information manager for the Bassetlaw Contact Centre project.
At RIBA Stage 5, the role covered checking the models and their data, with clash detection reports if required. For the client handover at RIBA Stage 6, Baker Hicks was to validate the project information model and produce a single coordinated COBie schema. Earlier, the launch work included reviewing the project's BIM documents and a launch meeting with the design team.
The £35,000 contract ran from April 2025 and was due to end in March 2026.
- What
- BIM and information management consultancy
- Buyer
- SCAPE
- Supplier
- Baker Hicks Limited
- Value
- £35,000
- How it was bought
- Not published
- Dates and next
- Apr 2025 to Mar 2026