Assix refurbishes two floors of Sheffield's Edgar Allen House
- University of Sheffield
- Yorkshire and the Humber
- Open procedure (above threshold)
- 6 September 2026 to 14 October 2026
The University of Sheffield hired Assix Ltd to refurbish the second and third floors of Edgar Allen House on its campus.
The job reworked the layout of both floors and upgraded the mechanical and electrical services. It also improved the existing toilets and added fibre connections.
Assix Ltd was chosen after an open tender, at £689,492 against an estimate of £839,149. The contract was awarded in August 2026 and was due to end in October 2026.
- What
- Interior fit-out and office reconfiguration
- Supplier
- Assix Ltd
- Value
- £689,492
- How it was bought
- Open procedure (above threshold)
- Dates and next
- Sep 2026 to Oct 2026