MCFC pipework at the Translational Energy Research Centre goes to Ensign
- University of Sheffield
- Yorkshire and the Humber
- Open procedure (below threshold)
- 24 December 2024 to 28 February 2025
The University of Sheffield hired Ensign Site Services to fabricate and install pipework for a Molten Carbonate Fuel Cell at the Translational Energy Research Centre. The pipes joined the cell to the site's gas supply and to university-supplied equipment that prepared the feed gases and treated the exhaust. Vent lines ran out through the building's roof to a safe area.
The award was £188,523 after an open tender estimated at £180,000. The work was due to end in February 2025.
- What
- Industrial and process mechanical services
- Supplier
- Ensign Site Services
- Value
- £188,523
- How it was bought
- Open procedure (below threshold)
- Dates and next
- Dec 2024 to Feb 2025