Frankwell Bridge ramp and flood defences planned by Shropshire Council
- Shropshire Council
- West Midlands
- 31 August 2027 to 31 March 2028
Shropshire Council wants a step-free ramp and permanent flood defences on the northern approach to Frankwell pedestrian bridge, beside the Guildhall in Shrewsbury. It is working with the Environment Agency and has two designs in mind. One pairs permanent defences with glazed panels and a ramp that comes down on the dry side. The other builds a ramp on top of the existing stepped ramp, with its landing on the wet side, beyond the demountable defences already there.
The contractor would help secure planning permission and a Flood Risk Activity Permit. The council asked suppliers which design works best and whether it could be built before the flood season starts in September 2027.
The project depends on a funding application. No estimate has been published, and suppliers were asked to respond by 8 October 2026.
- What
- Flood defence and flood alleviation works
- Buyer
- Shropshire Council
- Estimated value
- Not published
- How it will be bought
- Not published
- Responses due
- 8 Oct 2026
- Contract dates
- Aug 2027 to Mar 2028