Shropshire Council plans to appoint a charge point operator under a concession to build and run public electric vehicle charging across the county. The network draws on the Department for Transport's Local Electric Vehicle Infrastructure (LEVI) Fund, and the council has secured £2,006,000 from it.
Shropshire has approximately 546 public charge points, and the council expects to add over 550 more. Most would be 7kW units, backed by 22kW fast chargers and a limited number of rapid chargers at sites with enough network capacity. The operator would invest alongside the LEVI money and take on design, network connections, running, upkeep, customer service and payments.
The council has tested its refined plans with the market a second time. The concession is estimated at £108m and is proposed to run for 15 years, with an option to extend by two.
- What
- Public EV charging network concessions
- Buyer
- Shropshire Council
- Estimated value
- £108m
- How it will be bought
- Not published
- Responses due
- 20 Oct 2026
- Contract dates
- Nov 2027 to Nov 2042
- Option to Nov 2043