Southampton EV charging network concession goes to Urban Fox Networks
- Southampton City Council
- South East
- Open procedure, 7 bids
- 1 October 2026 to 30 September 2041
Southampton City Council chose Urban Fox Networks as the single operator to build and run a new public EV charging network across the city.
Urban Fox must install at least 505 chargepoints during the concession, with 168 in place by 2028. The chargers will be slow or standard units, sited on the street unless width, power supply or a protected area rules it out. When the concession ends, the council takes over the local connection assets and can choose to take the chargepoints too.
The council has secured £1.63m from the Government's Low Emission Vehicle Infrastructure (LEVI) scheme. Because that grant is fixed, the commercial offer counted for only 10% of the score and the solution for 50%. Seven bids came in. The £30m concession runs for 15 years from October 2026, with an option for one more year.
Contract ends September 2041
- What
- Public EV charging network concessions
- Supplier
- Urban Fox Networks
- Value
- £30m
- How it was bought
- Open procedure
- 7 bids
- Dates and next
- Oct 2026 to Sep 2041
- Option to Sep 2042