Leisure centre decarbonisation advice for Southwark goes to Eddisons
- London Borough of Southwark
- London
- Open procedure
- 2 June 2025 to 30 June 2028
The London Borough of Southwark appointed Eddisons to survey and advise on decarbonisation designs for five of its leisure centres. The sites are Camberwell, The Castle, Dulwich and Peckham Pulse leisure centres and Surrey Docks Fitness and Watersports Centre.
The council aims to cut its operational emissions by 50% by 2026, and leisure centres made up 36% of its 2021/22 baseline. The centres came back in house from Everyone Active in June 2023. In late November 2024 the council bid for Public Sector Decarbonisation Scheme (PSDS) wave 4 funding for the five sites. Eddisons prepared the bid's heat decarbonisation plan, to RIBA Stage 2.
Eddisons took lot 4, for surveying and strategic advice, after an open tender. The lot was worth £1,081,972 and runs from June 2025 to June 2028.
Contract ends June 2028
- What
- Energy audits and building decarbonisation plans
- Supplier
- 2 suppliers
- Eddisons and 1 more
- Value
- £1.08m
- How it was bought
- Open procedure
- Dates and next
- Jun 2025 to Jun 2028