Contract awardedGroundworks, enabling works and site infrastructure

Bottom Groundworks builds two exercise yards at HMP & YOI Polmont

The Scottish Prison Service hired Bottom Groundworks to build two new outdoor exercise yards at HMP & YOI Polmont. The prison wanted the extra yards to support its regime.

The job included taking out an existing sports pitch. Each yard was to get a tarmac surface, lighting and security CCTV, along with the groundworks needed. Prison-grade fencing 5.2m high was to enclose and divide the yards.

Bidders priced the work against a completed stage 4 design, under a traditional contract. Six bids came in after an open tender, and Bottom Groundworks won the eight-month contract at £430,000.

What
Groundworks, enabling works and site infrastructure
Value
£430,000
How it was bought
Open procedure
6 bids
Dates and next
12 Mar 2026

How it was bought

3 official notices
  1. 29 Oct 2025Planning noticePublic Contracts Scotland
  2. 16 Dec 2025Tender noticePublic Contracts Scotland
  3. 30 Jan 2026Bids closed6 bids
  4. 18 Mar 2026Award noticePublic Contracts Scotland

How it compares

With every groundworks, enabling works and site infrastructure award since 2021

Half of awards fall between £75,316 and £1.34mMedian £300,000

Awards
608
Firms that won them
550
Median award
£300,000
of 563 with a value
This award
Bigger than 57%
of them
Typical length
5 months
In Scotland
78 awards

Bottom Groundworks ranks 107th of 550 firms for groundworks, enabling works and site infrastructure awards since 2021.

RankFirmAwardsValue
1Locked7£10.9m
1Locked7£4.28m
1Locked7£4.27m
4Locked6£28.2m
4Locked6£16.1m
4Locked6£9.74m
107Bottom Groundworks Won this one1£430,000
See who wins this work

Figures to 25 November 2026

Groundworks, enabling works and site infrastructure at other buyers

Scottish Prison Service has awarded 350 contracts since 2021.

See Scottish Prison Service's page
  • Bottom Groundworks has won 3 public contracts since 2021.

3 groundworks, enabling works and site infrastructure tenders are open now

See them
More groundworks, enabling works and site infrastructure contracts awarded in 2026