High Constellation windfarm cabling goes to United Infrastructure
- SSEN Transmission
- Scotland
SSEN Transmission has chosen United Infrastructure Power T&D for the early stages of the 132kV underground cabling on the High Constellation Windfarm Connection project.
The firm's first job is design, engineering and the preparatory work before building starts. SSEN Transmission can also instruct the firm to go on and build the cables, then test, commission and hand them over.
No value, start or end date was published for the contract.
- What
- Electricity network works and connections
- Buyer
- SSEN Transmission
- Value
- Not published
- How it was bought
- Not published
- Dates and next
- 27 Jul 2026