Arup takes on early design of the Billingham Beck Bridge replacement
- Stockton-on-Tees Borough Council
- North East
- Call-off, 1 bid
Stockton-on-Tees Borough Council hired Arup to develop the preliminary design for replacing Billingham Beck Bridge.
Arup's brief spans structural and highways design, geotechnical and environmental input and CDM duties, with project management on top.
The council ordered the work through the North East Procurement Organisation's Support Services for the Development of the Built Environment framework (NEPO212), on lowest price. The award, made in September 2026, was £84,890.
- What
- Bridge and structures inspection, assessment and design
- Supplier
- Arup
- Value
- £84,890
- How it was bought
- Call-off, North East Procurement Organisation (NEPO)
- 1 bid
- Dates and next
- 4 Sep 2026