Hydrospec replaces Stephen Hawking's hydrotherapy pool for Tower Hamlets
- London Borough of Tower Hamlets
- London
- Direct
- 27 April 2026 to 30 April 2026
The London Borough of Tower Hamlets hired Hydrospec Limited to replace Stephen Hawking's hydrotherapy pool, at a school for severely disabled children. The old pool had problems including leaks, and the new one was to be fully accessible and easy to maintain.
The works ran from a structural survey to heating, ventilation, drainage and lighting upgrades, a full redecoration and new plant room equipment.
The council awarded the £717,702 contract to Hydrospec directly in July 2025. It was due to end in April 2026.
- What
- Swimming pool plant and pool maintenance
- Supplier
- Hydrospec Limited
- Value
- £717,702
- How it was bought
- Direct
- Dates and next
- Apr 2026 to Apr 2026