Road-rail recovery vehicle for Translink's railway comes from Hargreaves
- Translink
- Northern Ireland
- Open procedure, 2 bids
- 3 September 2026 to 2 September 2029
Translink is buying a road-rail recovery vehicle from Allan J Hargreaves Plant Engineers Limited for the Northern Ireland Railways network.
The vehicle is there for a fast response when a serious accident or incident happens on the railway. It must work on roads, off-road and on 1600mm gauge track, with a turntable device for turning in tight spots. It must carry six people legally on UK roads, with about 3 tonnes of equipment in a rear box body that the supplier designs. A full set of lightweight tooling, fit for current and future rolling stock, is stored on board.
Two bids came in, with technical answers worth 60% of the score and the fixed price 40%. Hargreaves won in August 2026 at £810,000, and the contract runs to September 2029, with up to 12 months more possible.
Contract ends September 2029
- What
- On-track plant and engineering trains
- Buyer
- Translink
- Value
- £810,000
- How it was bought
- Open procedure
- 2 bids
- Dates and next
- Sep 2026 to Sep 2029
- Option to Sep 2030