Engineering trains for Core Valleys Lines works come from Network Rail
- Transport for Wales
- Wales
- Direct award
- 19 May 2026 to 14 May 2029
Transport for Wales has engaged Network Rail Infrastructure Limited to provide engineering trains and on-track machines for works on the Core Valleys Lines (CVL).
The trains and machines support track maintenance, renewal and construction across the network, and associated services come with them.
The £4.95m contract was awarded directly in May 2026. It runs for three years, and up to two one-year extensions could take it to May 2031.
Contract ends May 2029
- What
- On-track plant and engineering trains
- Buyer
- Transport for Wales
- Value
- £4.95m
- How it was bought
- Direct award
- Dates and next
- May 2026 to May 2029
- Option to May 2031