WSP updates A9(T) traffic modelling at Tore for Transport Scotland
- Transport Scotland
- Scotland
- Call-off, 1 bid
Transport Scotland hired WSP to update and expand the existing traffic model for the A9(T) between North Kessock and Tore Roundabout.
An earlier study of the stretch, about 6km long, proposed options including traffic signals at Tore Roundabout and closing or restricting junctions in between. A VISSIM model then tested signals at Tore and a possible closure of Munlochy Junction. The signals were meant to improve active travel, particularly to the local primary school.
WSP's work tests those options against future development from the Black Isle. The study weighs traffic flow, journey times and local access for Tore residents, and ends with recommendations for the Tore and Black Isle Study. The £89,330 order came through lot 2 of the Development Management, Road Safety and Active Travel Support Services Framework.
- What
- Transport modelling and scheme appraisal
- Buyer
- Transport Scotland
- Supplier
- WSP
- Value
- £89,330
- How it was bought
- Call-off, Transport Scotland
- 1 bid
- Dates and next
- 15 Jul 2026