UEA Sportspark's outdoor sports lighting goes LED with Empower Services
- University of East Anglia
- East of England
- Open procedure (below threshold)
- 10 January 2025 to 9 January 2026
The University of East Anglia hired Empower Services, a small business, to replace the outdoor sports lighting at its Sportspark with LED.
The Sportspark, on the university's campus at Norwich Research Park, draws 1.4 million visitors a year. Its metal halide lighting was not efficient enough, and it fell short of the standards and reliability a site this busy needed. The upgrade covered all the external sports areas, including the eight-lane athletics track, six tarmacadam tennis courts, two sand-dressed Astro turf pitches and the 3G pitches.
The £352,000 contract followed an open tender. It ran from January 2025 and was due to end in January 2026.
- What
- External, amenity and sports floodlighting
- Supplier
- Empower Services
- Value
- £352,000
- How it was bought
- Open procedure (below threshold)
- Dates and next
- Jan 2025 to Jan 2026