Hi-CrIS test rig: UK Fusion Energy plans a design and build for STEP
- UK Fusion Energy Ltd
- 30 April 2027 to 30 April 2028
UK Fusion Energy Ltd plans to buy the design and build of the Hi-CrIS Test Rig under the Spherical Tokamak for Energy Production (STEP) programme. The rig would test samples of Rare-earth Barium Copper Oxide (REBCO) coated conductor while they are exposed to neutrons and gamma rays at cryogenic temperatures. The samples would carry their rated current and sit under strain in high magnetic fields at the same time. STEP's plasma is to be held by superconducting magnets, which make up about 25% of the cost of the STEP Prototype Powerplant. The results will help predict how long those magnets would last.
The company asked suppliers for information by 25 September 2026 to help shape the specification. It has published no estimate, and the work is expected to take 12 months from April 2027.
- What
- Nuclear technical support, engineering and safety
- Buyer
- UK Fusion Energy Ltd
- Estimated value
- Not published
- How it will be bought
- Not published
- Responses due
- 25 Sep 2026
- Contract dates
- Apr 2027 to Apr 2028