Project SHARED studies hydrogen resilience for UK Power Networks
- UK Power Networks
- London
- Direct
- 27 March 2026 to 27 December 2026
UK Power Networks is working with Frazer-Nash Consultancy and The First Element Group Ltd on the alpha phase of Project SHARED. The project tests whether hydrogen could make supply more resilient at lower cost than reinforcing the network in rural areas where power cuts are common.
The partners run network simulations and lab tests, draw up engineering concepts and gather evidence for possible later demonstrations. Funding comes from Ofgem's Strategic Innovation Fund, which was asked for £499,526, with £63,036 from the partners.
The alpha phase is estimated at £562,562 in all. That covers £284,532 for Frazer-Nash, £155,700 for First Element and £122,330 of UK Power Networks' own costs. The contract was awarded directly in March 2026 and runs to December 2026.
Contract ends December 2026
- What
- Local area energy planning and energy infrastructure feasibility
- Buyer
- UK Power Networks
- Supplier
- 2 suppliers
- Frazer-Nash Consultancy and 1 more
- Value
- £562,562
- How it was bought
- Direct
- Dates and next
- Mar 2026 to Dec 2026