H3AT control room design planned by the UK Atomic Energy Authority
- UK Atomic Energy Authority
- South East
- 1 March 2027 to 27 July 2027
The UK Atomic Energy Authority plans to buy the design of a dedicated control room for H3AT operations. The designer would survey the existing room and its services, then draw up layout options and a recommended arrangement. The layout must account for sightlines, accessibility, operator workflows and later expansion, backed by a human factors and ergonomics assessment.
The furniture package includes six operator workstations and one engineering workstation, which must be bespoke control room consoles rather than standard office furniture. The package also covers one security and communications workstation, one office desk, seating, storage and cable management. The designer would check whether the acoustic, lighting, electrical and HVAC set-up needs changing.
The authority marks the work as suitable for small businesses. It estimates the design at £65,000, with work due to start in March 2027.
Due in 8 days· 30 Nov 2026
- What
- Architectural design services
- Estimated value
- £65,000
- How it will be bought
- Not published
- Responses due
- 30 Nov 2026
- Contract dates
- Mar 2027 to Jul 2027