Self-raising platform for British Antarctic Survey designed by Fieldhouse
- UK Research and Innovation (UKRI)
- South West
- Limited
- 26 January 2026 to 31 March 2026
UK Research and Innovation (UKRI) hired Fieldhouse Engineering Ltd to produce the detailed design of a self-raising platform for the British Antarctic Survey. The work set out the platform's engineering specifications, to design standards suited to polar research.
UKRI awarded the £39,250 contract directly. It was due to end in March 2026, with an option to extend it by six months to September 2026.
- What
- Marine engineering and naval architecture
- Supplier
- Fieldhouse Engineering Ltd
- Value
- £39,250
- How it was bought
- Limited
- Dates and next
- Jan 2026 to Mar 2026
- Option to Sep 2026