UK Research and Innovation (UKRI) hired Bojen Electrical Ltd to put up a new shed for charging electric fork lifts.
The shed has to comply with the STFC fire strategy. The contractor is also running a new electrical supply to it from an existing substation, then testing and certifying the circuit.
UKRI chose the firm after a limited competition. The £45,869 contract started in June 2026 and is due to end in November 2026.
Contract ends November 2026
- What
- New-build construction of non-residential buildings
- Supplier
- Bojen Electrical Ltd
- Value
- £45,869
- How it was bought
- Below threshold - limited competition
- Dates and next
- Jun 2026 to Nov 2026