CB3 Design Associates designs Royal Observatory plant building Phase 2
- UK Research and Innovation (UKRI)
- Scotland
- Below threshold - limited competition
- 1 October 2026 to 31 March 2027
UK Research and Innovation (UKRI) hired CB3 Design Associates to design Phase 2 of the central plant building at the Royal Observatory in Edinburgh.
Phase 2 finishes the site with a single-storey building that takes in and roofs over the Phase 1 open-air enclosure. The design covers the plant building and the routes for building services across the site, but no work on the existing buildings.
UKRI made the £56,250 appointment after a limited competition in October 2026. It runs to March 2027.
Contract ends March 2027
- What
- Architectural design services
- Supplier
- CB3 Design Associates Ltd
- Value
- £56,250
- How it was bought
- Below threshold - limited competition
- Dates and next
- Oct 2026 to Mar 2027