WRES builds UKRI a welded frame assembly for argon tanks
- UK Research and Innovation (UKRI)
- South West
- Limited
- 16 January 2026 to 30 June 2026
UK Research and Innovation (UKRI) bought a welded frame assembly from WRES Ltd, built as a fabricated bank for argon tanks. The order also covered argon gas connectors for stages 1 and 2.
UKRI chose WRES after a limited competition. The £16,888 contract started in January 2026 and was due to end in June 2026.
- What
- Architectural metalwork and metal fabrication
- Supplier
- WRES Ltd
- Value
- £16,888
- How it was bought
- Limited
- Dates and next
- Jan 2026 to Jun 2026