Hoare Lea assesses theatre ventilation energy for Lincolnshire hospitals
- United Lincolnshire Teaching Hospitals NHS Trust
- East Midlands
- Call-off from a framework agreement
- 30 April 2026 to 29 June 2026
United Lincolnshire Teaching Hospitals NHS Trust hired engineering consultant Hoare Lea to study the energy use of its theatre ventilation.
The trust wanted to know whether its theatre ventilation could switch automatically to a lower 'set-back' setting, set off by occupancy detection or by BMS schedules. To answer that, Hoare Lea had to establish how each system ran and how much energy it used. The study also gave a high-level view of the cost, energy saved, payback period and lifecycle savings.
The trust ordered the study as a call-off from a framework agreement. The £29,881 contract started in April 2026 and was due to end in June 2026.
- What
- Energy audits and building decarbonisation plans
- Supplier
- Hoare Lea
- Value
- £29,881
- How it was bought
- Call-off from a framework agreement
- Dates and next
- Apr 2026 to Jun 2026