Salford WwTW treatment equipment for United Utilities comes from Siltbuster
- United Utilities Water Limited
- North West
- Open
- 27 January 2026 to 26 January 2027
United Utilities Water Limited awarded Siltbuster Limited £485,000 for biological treatment equipment at Salford WwTW, against a tender estimate of £350,000.
The equipment is there to keep treatment at the works within compliant levels. When the tender went out, the site relied on two rented MBBR units for extra ammonia treatment capacity, backed by control panels and blower skids. Siltbuster brings the new equipment to site and installs it. It can include MBBR and DAF units as well as pipework and blower skids.
The open tender judged bids on cost and lead time. The one-year contract runs from January 2026 to January 2027.
Contract ends January 2027
- What
- Water and wastewater treatment works and utility MEICA
- Supplier
- Siltbuster Limited
- Value
- £485,000
- How it was bought
- Open
- Dates and next
- Jan 2026 to Jan 2027