MML insulators for WMCA replaced by Electrification Construction Services
- West Midlands Combined Authority
- West Midlands
- Single tender action (below threshold)
- 2 April 2025 to 30 May 2025
West Midlands Combined Authority needed section insulators on the MML overhead line replaced as an emergency.
The work was a one-off, reactive repair to the electrification equipment. Electrification Construction Services Limited was awarded the £51,285 works directly, without a competition. The job ran from April 2025 and was due to finish in May 2025.
- What
- Rail electrification and signalling
- Value
- £51,285
- How it was bought
- Single tender action (below threshold)
- Dates and next
- Apr 2025 to May 2025