Henry Dickins Court Kitchen Garden rebuild
- The Royal Borough of Kensington and Chelsea
- London
- Open procedure
- 17 February 2025 to 11 April 2025
The project involves the physical reconstruction of raised garden beds at Henry Dickins Court. The work requires the removal of existing structures and the installation of new raised beds constructed from recycled plastic sleepers to ensure durability and longevity in a community kitchen garden setting.
- Awarded value
- £27k
- As published
- Published
- 5 June 2025
- Contract length
- 2 months
- Ends 11 April 2025