Overhead Catenary System for HS2 Ltd
- HS2
- Selective procedure
- 3 February 2025 to 26 August 2032
Overhead catenary systems covering 469 single track km, including 250 bridges, 58 viaducts, 47 underbridges, 148 overbridges and 115 culverts. Six passing or maintenance loops or sidings and four complex track junctions, plus 131 point ends: 99 high-speed turnouts (130 to 230 km/h), 32 low-medium speed turnouts (up to 100 km/h) and 5 traps or diamonds.
- Awarded value
- £207m
- As published
- Published
- 6 February 2025
- Contract length
- 91 months
- Ends 26 August 2032