Fit Out -WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope - Old Oak Common (S4) Station
- Balfour Beatty VINCI Systra JV
- London
- 4 March 2026 to 20 November 2028
Design and installation of external cladding, stainless-steel linings, louvered screens, overclad doors, and platform column recess covers for the Old Oak Common station project. The scope includes design development, fabrication drawings, provision of prototypes, and full assurance documentation. Work requires coordination with multiple interfacing parties and specific methodology for working within a live track environment.
- Awarded value
- £20m
- As published
- Published
- 29 February 2024
- Contracts Finder
- Contract length
- 33 months
- Ends 20 November 2028