Football Pitch AGA
- Heart Academies Trust
- Yorkshire and the Humber
- Selective procedure
- 1 June 2025 to 31 May 2026
Conversion of an existing overgrown Redgra surface into a full-size grass football pitch suitable for football and rugby. The project requires excavation and disposal of existing materials, installation of a new subbase, topsoil application, seed selection, and the design and implementation of drainage systems to ensure year-round usability.
- Awarded value
- £265k
- As published
- Published
- 10 June 2025
- Contract length
- 12 months
- Ends 31 May 2026