Ermine Road Hoist Installation
- London Borough of Haringey
- London
- Invited to quote
- 24 March 2026 to 31 August 2026
The project involves the supply and installation of medical hoist equipment, including necessary structural reinforcement to support the units. Work is performed under a principal contractor, requiring coordination with site-specific schedules of work for the installation of medical equipment.
- Awarded value
- £83k
- As published
- Published
- 27 April 2026
- Contract length
- 5 months
- Ends 31 August 2026