Phase 2 of the refurbishment of the kitchen - South Kensington site - LFCG
- Lycee Francais Charles de Gaulle
- London
- Open procedure
- 23 June 2025 to 23 October 2025
Phase 2 refurbishment of a basement commercial kitchen serving 2,300 daily meals. Works include site preparation, installation of ventilation systems, electrical upgrades, plumbing, partitions, and resin flooring, alongside the integration of new catering equipment and cold rooms.
- Awarded value
- £1.7m
- As published
- Published
- 11 June 2025
- Contract length
- 4 months
- Ends 23 October 2025