Pilgrim Substation Stage 1 design
- United Lincolnshire Teaching Hospitals NHS Trust
- East Midlands
- Selective procedure
- 3 December 2025 to 31 March 2026
Delivery of Stage 1 design services for the replacement of the Pilgrim Substation. The work involves technical electrical design and planning for critical power distribution infrastructure within a clinical setting, ensuring compliance with hospital electrical standards and site-specific operational requirements.
- Awarded value
- £100k
- As published
- Published
- 3 December 2025
- Contract length
- 4 months
- Ends 31 March 2026