Ultrapure Water System
- University of Southampton
- South East
- Open procedure
- 14 October 2024 to 15 December 2029
Replacement of an obsolete ultrapure water system, providing ASTM D5127 E1.3 water at a maximum capacity of more than 2,000 litres per hour for ISO 5 cleanrooms used in silicon and III-V semiconductor device processing. The system is to be located on the fourth floor of the Mountbatten Building.
- Awarded value
- £625k
- As published
- Published
- 1 July 2024
- Contracts Finder
- Contract length
- 62 months
- Ends 15 December 2029