PSTN/BT Analogue to Fibre Migration Works
- Rotherham Metropolitan Borough Council
- Yorkshire and the Humber
- 4 March 2026 to 3 September 2026
The project involves the technical migration of CCTV transmission circuits from legacy BT analogue lines to fibre and wireless IP-based infrastructure. This is a time-critical infrastructure upgrade requiring the decommissioning of existing analogue systems and the installation, configuration, and testing of new digital transmission hardware to ensure continuous surveillance coverage.
- Awarded value
- £68k
- As published
- Published
- 15 April 2026
- Contract length
- 6 months
- Ends 3 September 2026