Fulwood Bridge Painting
- Via East Midlands Limited
- East Midlands
- Open procedure
- 22 June 2026 to 30 September 2026
Preparation and repainting of a three-span steel lattice girder bridge, including four lattice girders, cross bracing, and a steel trough deck. The structure features two 13.3m side spans and one 17.1m central span, with pier heights reaching up to 6.2m. Work is defined under an NEC ECSS contract.
- Awarded value
- £100k
- As published
- Published
- 16 April 2026
- Contract length
- 3 months
- Ends 30 September 2026