Fit Out - WP12.2.2 - WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station
- Balfour Beatty VINCI Systra JV
- London
- 21 April 2025 to 28 November 2025
Design, manufacture, supply, and installation of structural steelwork for accommodation blocks, lift and escalator electrical rooms, and central core supports at a major station development. The project requires detailed fabrication drawings, interface coordination with other finishes, and the provision of samples, prototypes, and comprehensive assurance documentation for structural elements at both platform and concourse levels.
- Awarded value
- £2.5m
- As published
- Published
- 30 January 2024
- Contracts Finder
- Contract length
- 7 months
- Ends 28 November 2025