Substation 3 Pilgrim Hospital Project design & ongoing consultant support
- United Lincolnshire Teaching Hospitals NHS Trust
- East Midlands
- Selective procedure
- 5 January 2026 to 31 March 2026
Design consultancy services for Substation 3 at Pilgrim Hospital, including technical design development and ongoing professional support. The project is focused on specific electrical infrastructure requirements within a clinical environment, requiring adherence to NHS technical standards and site-specific constraints for hospital power systems.
- Awarded value
- £40k
- As published
- Published
- 13 January 2026
- Contract length
- 3 months
- Ends 31 March 2026