4353/JN/24 - Fabrication and Mechanical Installation of Pipework for the MCFC
- University of Sheffield
- Yorkshire and the Humber
- Open procedure
- 24 December 2024 to 28 February 2025
Fabrication and mechanical installation of pipework for a Molten Carbonate Fuel Cell (MCFC) system. The scope includes integrating the fuel cell with free-issue balance of plant equipment for feed gas treatment, blending, and conditioning, as well as exhaust gas treatment. The project requires interconnecting the system to site gas infrastructure and routing vents to a safe area through the facility roof.
- Awarded value
- £189k
- As published
- Published
- 14 November 2024
- Contract length
- 2 months