PAHT - Plantroom Waterproofing to Structural Slab with Resin Flooring Works
- The Princess Alexandra Hospital NHS Trust
- South East
- Selective procedure
- 12 February 2026 to 31 March 2026
Provision of waterproofing to structural slabs and application of resin flooring within a hospital plantroom. This is a specific remedial construction project involving surface preparation and protective coating installation to ensure structural integrity and containment within a clinical facility environment.
- Awarded value
- £45k
- As published
- Published
- 17 February 2026
- Contract length
- 2 months