Design, Supply, and Installation of a Liquid Nitrogen Storage &Distribution System
- UK Atomic Energy Authority
- South East
- Open procedure
- 26 November 2025 to 27 September 2027
Design, supply, and installation of a liquid nitrogen storage and distribution system specifically for the H3AT facility. The project encompasses the full engineering lifecycle including system design, procurement of components, and on-site installation and commissioning at the Culham Campus.
- Awarded value
- £1.1m
- As published
- Published
- 19 March 2025
- Contract length
- 22 months
- Ends 27 September 2027