Fire Pressure Regulated Valves Maintenance Elizabeth Line
- Transport for London
- London
- Selective procedure
- 14 April 2026 to 9 April 2029
Off-site maintenance and calibration of 1,584 fire hydrant pressure regulating valves on a 36-month cycle. The service provider manages the technical testing and issuance of certificates of conformity for up to 40 units per week, with the buyer handling all on-site removal and reinstallation logistics.
- Awarded value
- £1.1m
- As published
- Published
- 6 May 2025
- Contract length
- 36 months
- Ends 9 April 2029