GWR Supply and Installation of Balises
- First Greater Western Limited
- South West
- Open procedure
- 16 March 2026 to 31 March 2027
Procurement, storage, design, and installation of Eurobalises at railway stations across the network to support Class 800 Hitachi fleet operations. The project includes ongoing maintenance and project change management to ensure system reliability and integration with existing signalling infrastructure.
- Awarded value
- £2.5m
- As published
- Published
- 16 May 2025
- Contract length
- 12 months
- Ends 31 March 2027