Adastra Park Drainage Improvements
- Hassocks Parish Council
- South East
- Open procedure
- 1 September 2025 to 11 October 2025
Installation of a new drainage system on a recreation ground, including establishing lines and levels, trench excavation, inspection chamber construction, and installation of perforated drainage pipes. The project also requires repairs to a concrete headwall and bank, flushing of existing pipework, and full site reinstatement with turf, followed by a 12-month maintenance period.
- Awarded value
- £59k
- As published
- Published
- 9 June 2025
- Contract length
- 1 month
- Ends 11 October 2025