Security Key Cabinet Replacement
- Natural History Museum
- London
- Open procedure
- 6 January 2026 to 31 March 2026
Removal of 7 existing key cabinets and the design, supply, and installation of 8 new security key cabinets across two sites. The project includes the secure migration of all physical keys and digital data from the legacy system to the new infrastructure, with all works to be completed within a three-month delivery window.
- Awarded value
- £175k
- As published
- Published
- 4 September 2025
- Contract length
- 3 months
- Ends 31 March 2026