Mini MILWEP - Concrete Floor Slab Rectification
- Nuclear Restoration Services
- North West
- Open procedure
- 5 January 2026 to 31 March 2026
Remediation of an existing building floor to create a uniform, level surface suitable for heavy-duty powered pallet truck operations. The project involves height reduction and infilling to achieve specified tolerances, with the final epoxy resin finish required to withstand repeated traffic and bearing pressures of 15N/mm2.
- Awarded value
- £46k
- As published
- Published
- 9 October 2025
- Contract length
- 3 months
- Ends 31 March 2026