Elizabeth Line signalling performance improvement Work package 1
- Transport for London
- London
- Direct award
- 24 July 2026 to 30 June 2027
This work package focuses on five key areas for the Elizabeth Line: system reliability, 28 trains-per-hour resilience, obsolescence management, operational flexibility, and timetabling enhancements. The project involves technical signalling upgrades and performance tuning to ensure high-frequency service stability and infrastructure longevity.
- Awarded value
- £3.5m
- As published
- Published
- 17 October 2025
- Contract length
- 11 months
- Ends 30 June 2027