HCC May 2025 - The Provision of Design and Installation of Flood Management and Drainage Systems at the Pix Brook - AWARD
- Hertfordshire County Council
- East of England
- Selective procedure
- 1 September 2025 to 31 October 2026
Provision of works for the Pix Brook 'Slow the Flow' project, focusing on Work Package 2. The scope includes the design and installation of Sustainable Drainage Systems (SuDS), Natural Flood Management (NFM) measures, and flow control infrastructure to reduce flood risk and improve water quality within the catchment area.
- Awarded value
- £1.2m
- As published
- Published
- 10 September 2025
- Contracts Finder
- Contract length
- 14 months
- Ends 31 October 2026