Outdoor Fitness and Recreation Equipment Installation (Calisthenics Rig, Multi-Use Games Area Upgrade, and Rebound Wall)
- North Mundham Parish Council
- South East
- Open procedure
- 23 February 2026 to 30 June 2026
The project involves the installation of a galvanised steel calisthenics rig with female-friendly specifications, an upgrade to an 8.95m x 22.95m multi-use games area including new fencing and line markings, and the installation of a rebound wall featuring target and cricket stump graphics. The contractor is responsible for site preparation, groundworks, equipment supply, and post-installation safety certification in accordance with BS EN 1176/1177 standards.
- Awarded value
- £600k
- As published
- Published
- 12 November 2025
- Contract length
- 4 months
- Ends 30 June 2026